Learn some of these decoration tips, you can be a supervisor
Many people have always thought that there is no high-tech home decoration, as long as the heart, responsible, you can do it! However, in some small technical details of daily construction, many decoration companies will think that the owner does not understand and omit, they do not consider the owner's normal life in the future, so in the subsequent life will produce unnecessary trouble.
Let's start with building walls:
Many people's home decoration, because of functional needs, designers will transform some walls, new walls are very normal things.
But worry free to tell you: in the construction process of the new wall in your home, did the workers give you this thing to put down the map in the tens of centimeters of the original wall?
This, you think, is just an ordinary piece of steel. Yeah, just plain steel. But there is a science here called "the knot tendon". Its role is to make the new wall and the old wall can be well combined.
For ordinary brick walls, use ordinary steel bars to make a hole of about 20 centimeters in the original wall and insert it into the new wall brick joint. Place every 50-60 cm.
If the original wall is concrete, you need to use 6-8MM expansion screws.
Or about painting the walls:
Why do many owners find that the walls that have just been painted will have many cracks in a few days?
There are many reasons for this phenomenon, and you have to distinguish it carefully.
First, the brick used to build the wall began to soak in water and did not soak through, the brick body itself was very dry, the moisture of the cement mortar was sucked dry by the brick, and the paint layer dried too fast.
The second is that the proportion of mortar used for painting is wrong.
The solution is to strengthen maintenance after painting, the simple way is to sprinkle more water on the wall in the first few days of painting, so that the painting layer can get moisture maintenance.
In fact, the decoration company is not willing to soak the brick through, not for fear of wasting water and time, but because of the fear of wall drying in the later period, affecting the construction of latex paint.
The owner of a new wall at home should not be too concerned about the construction period, and let the surface of the new wall dry and then do the latex paint construction.
Tips: How to verify their own wall is dry?
You put a slightly larger piece of plastic wrap on the wall, seal it off with tape, and stay overnight to see if there's any moisture in it? No, that's proof of latex paint
So for the developer's wall in the end is to shovel or keep good, shovel natural once and for all, but the labor cost is very high, there are not thousands of dollars down, keep the original wall, and worry about the developer's wall problems, cracking drum, then we use a case to explain the wall under what condition must shovel!
The mineral water bottle brought by the supervisor sprayed some water on the wall, and soon the wall changed in the wet position. The supervisor touched the wall with water, and the wall skin fell down, so the quality of the wall was too poor, and it must be shoveled and redone
This kind of wall is brushed with industrial white, if not treated now, brush the latex paint in the future, must drum, cracking, now save money in the future trouble.
In addition, if you touch the wall with your hand, your hand can leave white wall ash, which is not mixed with glue during the construction of the wall, and the powder situation is more serious, and it must be removed and redone.
Finally, remind everyone that the problem of the wall of the new house must not be ignored, and the problem should be found in time to negotiate with the decorator, the wall must not be left, do not regret in order to save money in the future. Now the labor cost of the shovel wall is generally 4-8 yuan/square meter, and the master can complete the work in 3 days, and the money can not be saved.